A JLG Productions company · Portugal

Portugal Robotics Campus

A Portuguese company building campuses where robot companies assemble, test and certify their machines for the European market. Three campuses over eight years, raised in steps — and a European law that makes their tenants need the first one from January 2027.

€8.7M raising now — step one €20M across three steps 15.2% target annual return, programme
Scroll

The opportunity in one minute

Four numbers, then the plan

€8.7M
step one, open now — it buys and refits the first building and puts the team in place
13.4%
target annual return on step one alone, after everything
15.2%
target annual return across the programme, once all three campuses are built
—
days until the open Portuguese funding round closes, 4 January 2027*

What we build. A 9,000 m² factory building with 10-metre ceilings and eleven truck docks, turned into rentable workshops for robot companies, a hall where their machines are safety-tested, and a small data centre for the computing that testing needs.

Why anyone pays for it. From January 2027 a new European law requires robots with self-learning safety functions to be tested by an independent body before they can be sold in Europe. Today there is no such tester anywhere in Portugal.

Why Portugal. It has the least automated factories in Western Europe — 89 robots per 10,000 workers against a European average of 231 — the cheapest skilled engineers in the region, and a government that pays up to 30% of an industrial investment like this one.

Why three campuses and not one. The work that wins the first campus — the state funding, the certification partnerships, the engineering team — is the same work that wins the next two. Campus one stands on its own; two and three are built on a team, a design and a bank relationship that are already paid for, which is why they come faster and cheaper.

* Portugal 2030 runs to 2029 and opens calls in rounds — this is the window open now, not the last one. Missing it delays the grant, it does not remove it.

Why Portugal

Portugal's factories have barely been automated

Industrial robots installed per 10,000 factory workers.

Germany
449
European average
231
Spain
183
World average
132
Portugal
89

A country that has to automate. Portuguese factories run at 39% of the European average and a fifth of Germany's. Every one of those factories competes with German and Spanish plants that are already automated, and the work of closing that gap — installing, integrating and certifying machines — is done locally, not imported.

And the engineers cost a third of Germany's. An hour of manufacturing labour costs €16.50 in Portugal against €49.50 in Germany. That gap is why robot companies already assemble here — and why testing and integration work can be won from Germany rather than lost to it.

Sources: IFR World Robotics 2025 — robot density by country · International Federation of Robotics · Destatis / Eurostat — hourly labour costs 2025

What creates the demand

A European law lands in January 2027

This is the part of the plan that does not depend on anyone's forecast. Two European laws, already passed and already dated, force robots to be tested by an independent body before they can be sold.

20 January 2027
The new Machinery Regulation applies

Robots whose safety depends on self-learning software can no longer be signed off by the manufacturer itself. They must be assessed by an accredited independent testing body. It replaces the 1990s-era rules outright, with no transition period.

—days from today
2 August 2028
The AI rules fold into the same law

Europe simplified this in July 2026. Rather than a robot being assessed under the AI Act as well, the artificial-intelligence safety requirements move into the Machinery Regulation itself, by a deadline of 2 August 2028. One law, one assessment — and the physical testing behind it still has to be done by someone with a hall and the rigs.

—days from today
The opening
Nobody in Portugal can do this work

Germany's TÜV SÜD became the first accredited body under the new law and TÜV Rheinland is already certifying robots and autonomous vehicles. The accredited testers are concentrated in Germany, France and the Netherlands. We found none in Portugal — in the country with the most factories left to automate.

$4.8bn → $22.6bnindependent AI testing and certification, 2025 to 2032

Sources: Regulation (EU) 2023/1230 — the Machinery Regulation · AI Act implementation timeline · Digital Omnibus on AI, Regulation (EU) 2026/1744 — one assessment, not two · TÜV SÜD — first accredited body · TÜV Rheinland — robot certification · MarketsandMarkets — AI testing & certification market

The business

Three ways the campus earns

Click any of the three to see how it works.

One

Workshops we rent out

Ready-to-use industrial units for robot makers and the engineering firms that install robots, with shared loading, measuring equipment and safety enclosures.

Who rents them
Robot manufacturers who need an assembly point inside the European Union, and the engineering companies that fit robots into factories across northern Portugal and Spain.
What it earns
Multi-year rent, plus income from the shared services. This is the steady, predictable part of the business.
Why they come here
Skilled labour at a third of German cost, inside the EU customs area, 45 minutes from the port of Leixões and in the middle of Portugal's car-parts and mould-making industry.
Open
Two

The testing hall

A tall, open hall where robots are put through the safety and reliability tests the new European law requires, and the paperwork is prepared for the body that signs them off.

What happens in it
Machines are run against the European safety standards for industrial and mobile robots — speed, force, stopping distance, how the machine behaves when a person walks into its path.
What it earns
A fee for each testing programme, plus retainers from manufacturers who come back with every new model. It is the highest-margin part of the campus.
Who we work with, not against
The large certification houses — TÜV, SGS, Bureau Veritas, DEKRA — own the final signature, and we are not trying to take it from them. We provide the building, the rigs and the engineers that the testing itself needs, and hand the file to them. Portugal's national engineering institute, INESC TEC, already runs a small version of this for companies and is our first partner conversation.
Open
Three

A small data centre

One to three megawatts of computing on site, for the simulation and the data the robots on the campus generate — rented by the kilowatt, like any data centre.

Why it is small on purpose
It serves the tenants in the building rather than chasing the giants. Testing a robot means running its software in the same room, within milliseconds of the machine — that work cannot be sent to a distant cloud, and it does not need a huge facility.
What it earns
€110 to €170 per kilowatt per month, the standard rate for rented data-centre space in Portugal, on customers who are already renting workshops from us.
Where it can grow
Portugal's national data-centre plan, adopted in 2026, offers pre-approved land, priority electricity connections and possible state co-investment through the national development bank. That is the route for enlarging it later — with the first customers already on site.
Open

Why an existing building

We buy the structure, not the land

Building this from scratch would cost three to four times as much and take two years longer. These factory buildings already have what robot work needs, and they are for sale today at €200 to €424 per square metre.

What comes with the buildingWhy it matters for robots
10-metre ceilingsOverhead cranes, service rigs and a mezzanine level for test cells. Tall robots and lifting equipment need the height; an ordinary warehouse does not have it.
Eleven truck docks and a walled yardRobots, jigs and crates move in and out every day, and the yard is where mobile machines are tested on real surfaces and in the rain.
A heavy industrial floorRobot bases are bolted to the slab and exert real force when they move. The floor is already rated for it — pouring a new one is one of the most expensive things you can do.
An existing electricity connectionWe need one to three megawatts, which an industrial site of this size can already support. Confirming it in writing is the first thing the money raised now pays for.
Open land around itWe buy sites where the plot is at least twice the building's footprint. The spare land carries the electrical plant, outdoor testing for mobile machines, and a second building later.

The shortlist

Three buildings, all for sale now

Live on the market as of 3 November 2026, and all three in regions that qualify for the full 30% of Portuguese state support. Industrial listings move quickly, so the shortlist is refreshed continuously — the economics on this page are built on the price per square metre, not on any one building. Clear height and power are confirmed on site, not from a listing.

Prices and areas are as advertised on the open market, 3 November 2026, and are unnegotiated except where stated. Regional support confirmed against the European Commission's aid map · industry context: CEFAMOL — Portuguese mould industry · INESC TEC

What Portugal contributes

Nearly a third of the investment comes back

Checked against Portuguese tax law, the EU state-aid map and the open funding notices. Assumes €13.2M of qualifying equipment and building work.

Investment tax credit (RFAI)
30% of qualifying investment up to €15M, 10% above, in the region our buildings are in. Claimed in our own tax return — nobody has to approve it. Capped at half the tax due each year, carried forward ten years. Investment Tax Code, arts. 22–26
€3.96Mtax credit
Portugal 2030 grant round — open now
A €107.95M round for industrial investment in digital and advanced technology, open to companies of any size. Applications are open until 4 January 2027*, and ours goes in for campus one. Notice MPr-2026-10
Applyinggrant
Negotiated tax contract
Above €3M of investment, Portugal negotiates a tax credit of 10–25% plus relief from property and transfer taxes for up to ten years, handled directly by AICEP. An alternative to the credit above, not an addition. Investment Tax Code, arts. 2–11
10–25%negotiated
National data-centre plan
Adopted in 2026: pre-approved land, priority electricity connections and possible co-investment by Portugal's development bank, with AICEP as the single point of contact — a conversation we have already opened. The route for enlarging the computing side later. AICEP — national data-centre plan
Stage 3co-investment
Research and development credit (SIFIDE)
A cash saving on tax, not a grant: for every €100,000 the company spends developing test methods and software in the hall, €32,500 comes off its corporation tax bill, plus half of any year-on-year increase. The law runs to end-2026 and has been extended repeatedly; nothing beyond that is assumed here. Investment Tax Code, arts. 35–42
32.5%on R&D spend

The limit, so you know it up front

The European Commission caps total public support for a company this size in this region at 30% of qualifying investment, counting every source together.

Tax credit alone: €3.96MCap: €3.96M

At this size the automatic tax credit already uses the whole allowance, so a grant would replace it rather than add to it — until the project grows past €15M of qualifying investment, where the credit drops to 10% and real room opens up. Which route we take is decided before we file, and it is worth several hundred thousand euros.

* Portugal 2030 runs to 2029 and opens calls in rounds; further windows follow this one. The date that does not repeat is 31 December 2027, when the European aid map above expires and the 30% ceiling is re-set for 2028 onwards.
European Commission state-aid map for Portugal, 2022–2027 · Order 282/2014 — qualifying activities

What an investor earns

Two different numbers, and only one of them is your return

Return on cost is 8.5%. That is what one campus earns in a year against what it cost to build. It is the number a developer watches. It is not what you get paid.

Your return is 13.4% a year on step one, 15.2% across the programme. Both are after the head office is paid for and after the 10% founder stake, and both include the gain when a campus is sold. Step one returns less because one campus carries the whole head office, where three share it — which is the honest cost of going first, and why step one is priced below step two.

CaseWhat has to happenCampus profitWorth at exitYour returnMoney back
BaseThe plan as presented: 20 robots tested a year, computing 85% let, valued at 7% — still 125 points above prime Porto logistics€1.47M€21.0M15.2% a year
13.4% on step one
2.1×
UpsideThe testing hall fills as the 2027 law bites — 34 robots a year — and the computing room lets out€1.92M€29.5M26.4% a year
23.8% on step one
3.0×

Where it comes from. We build for €17.3M; let and operating, a buyer pays about €21M at a 7% yield, and prime Portuguese logistics traded at 5.50–5.75% this year. On top, €3.96M comes back as a tax credit. Borrowing 60% turns that gap into the return above.

The honest part. Targets, not promises. The assumption that moves the answer most is the yield a buyer pays for a finished campus, and the live model in the appendix lets you move it — take it to 8% and the campus is worth less than it cost. Nothing here is hidden from that test.

Every figure here is computed, not asserted — the model is in the appendix, and the code and its thirteen tests ship with the project. Figures are after the company's running costs and the founder's 10%; there is no management fee and no carried interest. Yield evidence: CBRE — Portugal Logistics, Q2 2026 (prime yields 5.50% Lisbon, 5.75% Porto) · Cushman & Wakefield — Portugal investment marketbeat

How it gets built

Three stages, and we are raising for the first

Year 1 · first campusYears 2–3 · repeat itYears 4–8 · run and realise
Money in€8.7M of equity — step one€8–10M from a bank once campus one is let, then €10M of equity for campus twoFully invested; cash coming back
What happensBuy the building · structural, electrical and grid surveys · file the Portuguese funding application before January · refit, workshops and test cells · first tenants inSecond building bought and refitted, six months faster because the design, the suppliers and the permits are now known · third tranche: a second hall or computing to 3 MWAll three let and operating · the tax credits come back over four years · sell or refinance from year six
Alongside itNo bank yet — the building is bought with equity, so nothing waits on a lenderThe bank funds the power upgrade and the computing room, and releases part of step one's equity backEach campus is worth about €21M at a 7% yield against €17.3M spent
Proof it is workingA tenant signed, the electricity confirmed in writing, the funding application filedCampus one at full occupancy; campus two built for less than campus oneFirst sale or refinancing, and the track record to do this again at a larger size

Each campus costs about €17.3M: €1.8M the building · €2.7M refit · €2.4M workshops, test cells and measuring equipment · €1.6M electrical upgrade · €6.5M per megawatt of computing · 15% contingency and professional fees. The company puts in 40% as equity and borrows the rest.

Risks

What could go wrong, and what we do about it

Click any risk to see how it is handled.

Comparable facilities

What similar centres cost, and who paid

Robotics centres of this kind get built in Europe regularly. Note who paid for each one: governments and EU programmes, not investors — because none of them was built to make money. They exist to serve research. Ours is the same size and the same kind of facility, built to let and to earn, which is why it can pay a return at all.

FacilityCostWho paidBuilt to earn?
National Robotarium
Edinburgh, opened 2022
£22.4M£21M UK government, £1.4M Scottish governmentNo — a public research facility
Fraunhofer IPA robotics centre
Stuttgart, 2019
€23MFraunhofer and the Cyber Valley consortiumNo — research institute, part of a 40,000 m² complex
AI-MATTERS
European network, 2023–2027
€60MThe European UnionNo — an EU-funded network of 25 organisations
ATLANTIS, INESC TEC
Viana do Castelo, Portugal
€8.5MEU Horizon 2020No — EU research money, and proof this gets built in Portugal
Portugal Robotics Campus
this project, stage 2
around €17.3MPrivate equity and bank debt, with €3.96M of Portuguese tax creditYes — let to tenants, and the only one here that pays investors

Sources: National Robotarium (Heriot-Watt University, 2022 opening) · Fraunhofer IPA · AI-MATTERS · INESC TEC / ATLANTIS · PRODUTECH innovation hub, Portugal

The ask

€8.7 million now, €20 million over three steps

Equity in a Portuguese operating company. Step one is €8.7M and buys the first building outright; the bank comes in once it is let, and step two funds the second campus. Target 13.4% a year on step one and 15.2% across the programme.

Step 1€8.7M equity, now. Buys the building and pays for the refit, the workshops and the test hall — €7.9M — plus the company set-up and a lean team until the campus earns. No bank yet, so nothing depends on a lender saying yes.
Step 2€8–10M from a bank, once tenants are signed. Funds the power upgrade and the computing room, and releases part of the original equity back. A Portuguese bank will lend 55–65% against a let industrial asset; none will lend that against an empty refit from a company with no track record, which is why it comes second.
Step 3€10M equity, for campus two. Raised against a built, let and earning campus one — at a higher share price than step one, because the risk that step one carried is gone.
Then€9.9M of Portuguese state support across the three campuses, a first sale or refinancing from year six, and the track record to do this again at a larger size.

Mark Goldenberg · Managing Partner · JLG Productions LDA, Lisbon
mark@jlg.productions · I lead the company and the operation: the buildings, the government relationships, the team and the capital.

The terms, and the clock

€8.7MStep one, as shares in one Portuguese company. €20M in total across the three steps.
No feesNo management fee and no carried interest. The company pays its own team, and you see that cost in the numbers.
90 / 10Investors hold 90% between them; I hold 10% for originating and running it. The lead investor takes a board seat.
Priced in stepsStep one buys in cheapest. Each later step is priced higher, because the building, the tenants and the bank are no longer a question by then.
8 yearsTo a first sale or refinancing, with campus one let and earning inside two.
4 Jan 2027The open Portuguese funding round closes and the application for campus one goes in before it. Further rounds follow to 2029, so this is a date to aim at rather than a cliff.
31 Dec 2027The European aid map behind the 30% tax credit expires. Investment made during 2027 is credited at the rate modelled here; from 2028 the rate is re-set. This is the one that does not repeat.
TodaySuitable buildings come and go on the open market, and the ones we want do not wait. That is the only part of this with no deadline and no protection.

Appendix A · where the money goes

Every euro of step one, and of the programme

Step one — €8.7MAmountNote
The building€1.8MBought outright — no lender involved
Refit: roof, floor, doors, offices€2.7MMakes it usable
Workshops, test cells, measuring kit€2.4MThis is what the first tenants rent
Fees and contingency€1.0M15% on the above
Formation and legal€0.2MIncorporation, shareholders' agreement, tax advice
Runway for a lean team€0.6MUntil the campus earns enough to pay for itself
Step one total€8.7MThe power upgrade and the computing room come next, from the bank
One campusAmountQualifies for state support?
The building€1.80MNo — land never qualifies
Refit: roof, floor, doors, offices€2.70MYes
Workshops, test cells, measuring equipment€2.40MYes
Electrical upgrade to 2 MVA€1.60MYes
Computing room, first megawatt€6.50MYes
Fees and contingency, 15%€2.25MPartly
Total€17.25M€13.20M qualifies → €3.96M back

Across all three steps: about €20M of equity, €21M of bank debt and €35M of buildings and equipment, with roughly €8M returned by the Portuguese state as tax credits. Step two's bank facility funds the €1.6M power upgrade and the €6.5M computing room at campus one, and releases part of step one's equity back; step three's €10M builds campus two.

Appendix B · the team

Seven people run the company. Each campus employs ten more.

This is the part a small raise could never pay for.

RoleWhat they doWhen
Managing Partner
Mark Goldenberg
Leads the company and the operation: shareholder relations, the buildings, the Portuguese state relationships, and the deal for each campusIn place
Investment & Finance DirectorModels each deal, raises and manages the bank debt, runs the company's reporting and auditMonth 1
Technical & Development DirectorOwns the refit: surveys, permits, the electrical upgrade, contractors, the build programme for all three campusesMonth 1
Commercial ManagerFinds and signs the tenants — robot makers and the engineering firms that install robotsMonth 3
Grants & Compliance ManagerThe Portuguese funding applications, the tax-credit file, EU calls. Part-time at firstMonth 2
Head of Robot TestingRuns the testing hall and the relationship with the certification bodies. A hire from TÜV, SGS or Portugal's engineering instituteCampus one opens
Office Manager / AnalystAdministration, bookkeeping, investor reporting supportMonth 6

What it costs. Salaries, Portuguese employer social charges, a 200 m² office in Porto or Aveiro, and legal, audit, travel and outside advisers come to about €1.02M a year at full strength. Year one is four people and just over half of that.

Who pays for it. The company does, out of the €4.4M set aside for it — and you can see that cost sitting in the returns, because there is no management fee to hide it in. Part comes back: each campus pays the company 3.5% of its build cost to run the construction, the standard arrangement in property development, which is already inside each campus' budget.

And at each campus. A site manager, four test technicians, two maintenance engineers, a data-centre technician and an administrator — ten per campus. Thirty-seven jobs at full deployment, which is what Portugal's investment agency scores an application on. We hire no certification engineers and no builders: that signature stays with TÜV and SGS, and the refit is contracted out.

Appendix C · structure and terms

What you own, and on what terms

What you buyShares in a Portuguese company that buys the buildings, refits them, employs the people and runs the campuses. Each campus sits in its own subsidiary, so one building's bank debt cannot reach another's.
The splitInvestors hold 90% of the company between them, in proportion to what they put in. I hold 10% as founder, for originating the project and running it — the upper end of what a sponsor who contributes work rather than capital normally takes. There is no management fee and no carried interest: the head office, including my salary, is a cost of the company and is visible in the numbers above.
Size€8.7M now, €20M across three steps. Everyone in the same step pays the same price per share; later steps are priced higher.
Your protectionsA shareholders' agreement: the lead investor takes a board seat, major decisions — buying a building, taking on debt, selling a campus, issuing new shares — need board approval, and there are tag-along and pre-emption rights so nobody is diluted or left behind.
DebtAbout 60% of each campus once it is let — senior, around 5%, secured on that campus alone and with no recourse to shareholders. Step one deliberately assumes no bank: the first building is bought with equity, so the plan does not stall if a lender says no.
ReportingQuarterly accounts and a written update, audited annual accounts, and an independent valuation of each campus once it is let.
Getting your money outCash distributions once the campuses are let, and a sale or refinancing from year six. This is an eight-year plan in an unlisted company: the shares are not liquid, and that is the trade for the return.

Legal basis: ESMA guidelines on the key concepts of the AIFMD — an undertaking with a general commercial or industrial purpose is not a collective investment undertaking. If we ever do raise a fund, at this size it would be a below-threshold manager registered with Portugal's regulator rather than fully authorised: Chambers — Alternative Funds, Portugal. Terms here are our proposal; the shareholders' agreement is drawn up with counsel before the first money is taken.

Appendix D · the model

One campus, with every assumption visible

This is the single-campus model the headline returns are built from. Our own estimates, not published data: building costs from the Portuguese market, rents and computing prices from comparable facilities. Move any input and the result recalculates.

The tax credit covers the factory building and the equipment, never the land under it.

Cost to build—
Annual return on cost—
Workshop rent and services
—
Robot testing
—
Data centre
—
Total revenue, once full
—
Profit before interest and tax
—
Investment that qualifies for support
—
Portuguese tax credit
—
Maximum public support allowed
—
Equity needed, at 40% of cost
—

—